Rail intermodal
42 mi
48.2 mi by road · 73 min
West Terminal
Operator: UPS
1107 BRICKYARD ROAD, CHIPLEY, FL 32428
Included in the UPS operator collection based on the sourced facility or operator name.
Rail intermodal
42 mi
48.2 mi by road · 73 min
West Terminal
Port area center
36.9 mi
41.9 mi by road · 61 min
Panama City Port Authority, FL
Cargo airport
Unknown distance
By-road distance unknown · Drive time unknown
No published destination
Straight-line distance to nearest published freight feature; drive time is by car, not a truck route. Context · not part of the assessment.
Context · not part of the assessment
Distance from this facility’s reviewed coordinate to the nearest official freight destinations. Estimated driving route (OpenStreetMap) on the public road network for a car profile — not a truck route.
| Class | Destination | Straight-line mi | By road mi | Drive |
|---|---|---|---|---|
| Seaport · statistical-area centroid | Panama City Port Authority, FLCoastal · USACE rank 103 · 2,560,292 short tons total | 37 | 42 | 1 h 1 min |
| Marine terminal · dock-level point | Port of Mobile · Main Docks/General CargoAlabama State Port Authority (ASPA) · BNSF, CN, CSX, KCS, NS, CGR | 150 | 163 | 3 h 3 min |
| Marine terminal · dock-level point | Port of Mobile · AutoMobile Ro/Ro International TerminalAutoMobile International Terminal · AGR via BNSF, CN, CSX, KCS, NS | 150 | 165 | 3 h 6 min |
| Rail intermodal | West TerminalCSX, NS via BAYL · TOFC/COFC · Port Panama City | 42 | 48 | 1 h 13 min |
| Rail intermodal | Container TerminalCN, CSX, KCS, ALE, CGR, TASD · TOFC/COFC · Port of Mobile | 150 | 164 | 3 h 5 min |
| Rail intermodal | Main Docks/General CargoBNSF, CN, CSX, KCS, NS, AGR, ALE, CGR, TASD · TOFC/COFC · Port of Mobile | 150 | 163 | 3 h 3 min |
Sources: U.S. DOT Bureau of Transportation Statistics, National Transportation Atlas Database (Principal Ports, Intermodal Freight Facilities Rail TOFC/COFC, Air-to-Truck, Marine Ro-Ro), public domain. By-road routing © OpenStreetMap contributors (ODbL), routing by OSRM; Estimated driving route (OpenStreetMap), not HOS, permit, weight, or hazmat aware. USACE principal-port polygons are tonnage-statistics areas, not dock footprints; the marine-terminal row is the dock-level point. Air-to-truck facilities reflect the dataset’s stated vintage. Straight-line and by-road figures describe proximity to an official source feature only; they do not establish route access, legal ingress, gate hours, truck restrictions, service, capacity, or that this facility uses any listed destination.
BTS NTAD · data Aug 2026 · retrieved Aug 18, 2026. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
Panama City Port Authority, FL · 36.9 mi straight-line
West Terminal · 42 mi straight-line
ntad-nhs · data date unknown · retrieved date unknown. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
· 0.8 mi straight-line
Public location context, not part of the risk assessment.
Florida Power & Light Co
Annual interruption minutes per customer: 702.1
Annual interruptions per customer: 1.04
No published information is currently available for this location.
No published information is currently available for this location.
Annual mean temperature: 65.4 °F
Annual precipitation: 62.26 in.
1991-2020 normals · GENEVA #2 station, 27.9 mi away
No published information is currently available for this location.
Pro
Locks mark Pro content and tools—not a claim that a record exists for this facility.
Checking Pro access…
Match under review. Some source records for this facility are still being checked; current confidence is review.
Provide a source link and explain what should be reviewed, including operator changes, closures, or a requested removal. Requests are moderated and never change or remove a profile automatically.