Rail intermodal
43 mi
52.6 mi by road · 75 min
Greensboro, NC
2494 RIVER SILOAM RD, SILOAM, NC 27047
Rail intermodal
43 mi
52.6 mi by road · 75 min
Greensboro, NC
Port
196.4 mi
288.7 mi by road · 339 min
Port of Charleston, SC
Cargo airport
37.8 mi
51.5 mi by road · 76 min
cargo reference GSO
Straight-line distance to nearest published freight feature; drive time is by car, not a truck route. Context · not part of the assessment.
Context · not part of the assessment
Distance from this facility’s reviewed coordinate to the nearest official freight destinations. Estimated driving route (OpenStreetMap) on the public road network for a car profile — not a truck route.
| Class | Destination | Straight-line mi | By road mi | Drive |
|---|---|---|---|---|
| Seaport · statistical-area boundary | Port of Charleston, SCRoad reference: North Charleston Terminal, SC; separate from geometric destination, not a verified gate. Origin coordinate precision: address_interpolated; not a verified gate. | 196 | 289 | 5 h 39 min |
| Rail intermodal | Greensboro, NCRoad reference: Greensboro, NC; separate from geometric destination, not a verified gate. Origin coordinate precision: address_interpolated; not a verified gate. | 43 | 53 | 1 h 15 min |
| Air cargo | cargo reference GSORoad reference: cargo reference GSO; separate from geometric destination, not a verified gate. Origin coordinate precision: address_interpolated; not a verified gate. | 38 | 51 | 1 h 16 min |
Sources: U.S. DOT Bureau of Transportation Statistics, National Transportation Atlas Database (Principal Ports, Intermodal Freight Facilities Rail TOFC/COFC, Air-to-Truck, Marine Ro-Ro), public domain. By-road routing © OpenStreetMap contributors (ODbL), routing by OSRM; Estimated driving route (OpenStreetMap), not HOS, permit, weight, or hazmat aware. USACE principal-port polygons are tonnage-statistics areas, not dock footprints; the marine-terminal row is the dock-level point. Air-to-truck facilities reflect the dataset’s stated vintage. Straight-line and by-road figures describe proximity to an official source feature only; they do not establish route access, legal ingress, gate hours, truck restrictions, service, capacity, or that this facility uses any listed destination.
BTS NTAD · data national-access-20260918-020ebb9ebed6-fa3d7693b929 · retrieved Sep 18, 2026. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
cargo reference GSO · 37.8 mi straight-line
BTS NTAD · data national-access-20260918-020ebb9ebed6-fa3d7693b929 · retrieved Sep 18, 2026. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
Greensboro, NC · 43 mi straight-line
BTS NTAD · data national-access-20260918-020ebb9ebed6-fa3d7693b929 · retrieved Sep 18, 2026. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
Port of Charleston, SC · 196.4 mi straight-line
Public location context, not part of the risk assessment.
Duke Energy Carolinas, LLC
Annual interruption minutes per customer: 1,626
Annual interruptions per customer: 1.96
Modeled events per year: 2.04
Published events: 57
Impacted area: 51.4 sq mi
FEMA NRI county-level modeled flood context; it does not describe this facility's flood zone or predict a facility loss.
Wildfire likelihood percentile: 33.5
USDA Wildfire Risk to Communities reports modeled county-level wildfire context for Surry County, NC. USDA Forest Service Wildfire Risk to Communities values are modeled relative area context. They are not a parcel inspection, forecast, insurance determination, facility loss estimate, or replacement for localized assessment.
Annual mean temperature: 56.6 °F
Annual precipitation: 46.62 in.
1991-2020 normals · YADKINVILLE 6 E station, 10.7 mi away
20 FEMA disaster declarations linked to this county (latest Jan 24, 2026)
Hurricane 8 · Snowstorm 4 · Tropical Storm 3
Pro
Locks mark Pro content and tools—not a claim that a record exists for this facility.
Checking Pro access…
Provide a source link and explain what should be reviewed, including operator changes, closures, or a requested removal. Requests are moderated and never change or remove a profile automatically.