Rail intermodal
48.2 mi
56.2 mi by road · 75 min
Greensboro, NC
2000 CANE CREEK PARKWAY, RINGGOLD, VA 24586-3911
Rail intermodal
48.2 mi
56.2 mi by road · 75 min
Greensboro, NC
Port
119.9 mi
137.3 mi by road · 187 min
Port of Virginia · Richmond Marine Terminal (RMT)
Cargo airport
47.6 mi
By-road distance unknown · Drive time unknown
PIEDMONT TRIAD INTL (GSO)
Straight-line distance to nearest published freight feature; drive time is by car, not a truck route. Context · not part of the assessment.
Context · not part of the assessment
Distance from this facility’s reviewed coordinate to the nearest official freight destinations. Estimated driving route (OpenStreetMap) on the public road network for a car profile — not a truck route.
| Class | Destination | Straight-line mi | By road mi | Drive |
|---|---|---|---|---|
| Marine terminal · dock-level point | Port of Virginia · Richmond Marine Terminal (RMT)Virginia Port Authority · CSX, NS | 120 | 137 | 3 h 7 min |
| Rail intermodal | Greensboro, NCNS · TOFC/COFC | 48 | 56 | 1 h 15 min |
| Rail intermodal | Richmond Marine Termianl (RMT)CSX, NS · TOFC/COFC · Port of Virginia | 120 | 137 | 3 h 7 min |
| Rail intermodal | Charlotte, NCCSX · COFC | 127 | 144 | 2 h 50 min |
| Air cargo | PIEDMONT TRIAD INTL (GSO)3 air-to-truck facilities · Federal Express; DHL Airlines; Delta Air Lines · vintage 12/2018 | 48 | no drivable route | |
| Air cargo | RALEIGH-DURHAM INTL (RDU)3 air-to-truck facilities · Federal Express; United Parcel Service · vintage 09/2018 | 58 | no drivable route |
Sources: U.S. DOT Bureau of Transportation Statistics, National Transportation Atlas Database (Principal Ports, Intermodal Freight Facilities Rail TOFC/COFC, Air-to-Truck, Marine Ro-Ro), public domain. By-road routing © OpenStreetMap contributors (ODbL), routing by OSRM; Estimated driving route (OpenStreetMap), not HOS, permit, weight, or hazmat aware. Air-to-truck facilities reflect the dataset’s stated vintage. Straight-line and by-road figures describe proximity to an official source feature only; they do not establish route access, legal ingress, gate hours, truck restrictions, service, capacity, or that this facility uses any listed destination.
BTS NTAD · data Aug 2026 · retrieved Aug 18, 2026. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
PIEDMONT TRIAD INTL (GSO) · 47.6 mi straight-line
Greensboro, NC · 48.2 mi straight-line
Port of Virginia · Richmond Marine Terminal (RMT) · 119.9 mi straight-line
Public location context, not part of the risk assessment.
Virginia Electric & Power Co
Annual interruption minutes per customer: 172.1
Annual interruptions per customer: 1.36
Modeled events per year: 2.29
Published events: 64
Impacted area: 54.3 sq mi
FEMA NRI county-level modeled flood context; it does not describe this facility's flood zone or predict a facility loss.
Wildfire likelihood percentile: 32.2
USDA Wildfire Risk to Communities reports modeled county-level wildfire context for Pittsylvania County, VA. USDA Forest Service Wildfire Risk to Communities values are modeled relative area context. They are not a parcel inspection, forecast, insurance determination, facility loss estimate, or replacement for localized assessment.
Annual mean temperature: 58.6 °F
Annual precipitation: 47.14 in.
1991-2020 normals · DANVILLE 2 SE station, 3.9 mi away
27 FEMA disaster declarations linked to this county (latest Jan 23, 2026)
Hurricane 7 · Severe Storm 7 · Snowstorm 3
Pro
Locks mark Pro content and tools—not a claim that a record exists for this facility.
Checking Pro access…
Provide a source link and explain what should be reviewed, including operator changes, closures, or a requested removal. Requests are moderated and never change or remove a profile automatically.