Rail intermodal
40.5 mi
45.9 mi by road · 51 min
Terminal
2300 MUNSFORD DRIVE, NEW ALBANY, MS 38652
Rail intermodal
40.5 mi
45.9 mi by road · 51 min
Terminal
Port
40.5 mi
45.9 mi by road · 51 min
Port Itawamba · Terminal
Cargo airport
64.3 mi
By-road distance unknown · Drive time unknown
FREDERICK W SMITH INTL/MEMPHIS (MEM)
Straight-line distance to nearest published freight feature; drive time is by car, not a truck route. Context · not part of the assessment.
Context · not part of the assessment
Distance from this facility’s reviewed coordinate to the nearest official freight destinations. Estimated driving route (OpenStreetMap) on the public road network for a car profile — not a truck route.
| Class | Destination | Straight-line mi | By road mi | Drive |
|---|---|---|---|---|
| Seaport · statistical-area centroid | Memphis-Shelby County Port, TNInternal · USACE rank 64 · 7,195,444 short tons total | 69 | 80 | 1 h 36 min |
| Seaport · statistical-area centroid | Helena-West Helena Port, ARInternal · USACE rank 140 · 1,260,685 short tons total | 102 | 145 | 3 h 11 min |
| Seaport · statistical-area centroid | Port of Rosedale, MSInternal · USACE rank 134 · 1,479,709 short tons total | 115 | 142 | 3 h 13 min |
| Marine terminal · dock-level point | Port Itawamba · TerminalItawamba County Port Authority · MSRW | 41 | 46 | 51 min |
| Rail intermodal | TerminalMSRW · COFC · Port Itawamba | 41 | 46 | 51 min |
| Rail intermodal | Memphis, TN - RossvilleNS · TOFC/COFC | 47 | 57 | 1 h 14 min |
| Rail intermodal | TerminalKCS, NS · COFC · Yellow Creek State Inland Port | 57 | 73 | 1 h 46 min |
| Air cargo | FREDERICK W SMITH INTL/MEMPHIS (MEM)8 air-to-truck facilities · United Parcel Service; Southwest Airlines; Delta Air Lines; Federal Express … · vintage 07/2018 | 64 | no drivable route |
Sources: U.S. DOT Bureau of Transportation Statistics, National Transportation Atlas Database (Principal Ports, Intermodal Freight Facilities Rail TOFC/COFC, Air-to-Truck, Marine Ro-Ro), public domain. By-road routing © OpenStreetMap contributors (ODbL), routing by OSRM; Estimated driving route (OpenStreetMap), not HOS, permit, weight, or hazmat aware. USACE principal-port polygons are tonnage-statistics areas, not dock footprints; the marine-terminal row is the dock-level point. Air-to-truck facilities reflect the dataset’s stated vintage. Straight-line and by-road figures describe proximity to an official source feature only; they do not establish route access, legal ingress, gate hours, truck restrictions, service, capacity, or that this facility uses any listed destination.
BTS NTAD · data Aug 2026 · retrieved Aug 18, 2026. Straight-line distances do not establish route access, gate hours, truck restrictions, service or capacity.
Port Itawamba · Terminal · 40.5 mi straight-line
Terminal · 40.5 mi straight-line
FREDERICK W SMITH INTL/MEMPHIS (MEM) · 64.3 mi straight-line
Public location context, not part of the risk assessment.
North East Mississippi EPA
Annual interruption minutes per customer: 463.3
Annual interruptions per customer: 1.7
Modeled events per year: 0.96
Published events: 27
Impacted area: 46.3 sq mi
FEMA NRI county-level modeled flood context; it does not describe this facility's flood zone or predict a facility loss.
Wildfire likelihood percentile: 68.7
USDA Wildfire Risk to Communities reports modeled county-level wildfire context for Union County, MS. USDA Forest Service Wildfire Risk to Communities values are modeled relative area context. They are not a parcel inspection, forecast, insurance determination, facility loss estimate, or replacement for localized assessment.
Annual mean temperature: 59.8 °F
Annual precipitation: 58.62 in.
1991-2020 normals · HICKORY FLAT station, 11.6 mi away
19 FEMA disaster declarations linked to this county (latest Feb 6, 2026)
Severe Storm 9 · Hurricane 4 · Biological 2
Reported by New Albany Police Department, 2024
Burglary: 23 reported
Larceny-theft: 64 reported
Motor-vehicle theft: 1 reported
Pro
Locks mark Pro content and tools—not a claim that a record exists for this facility.
Checking Pro access…
Provide a source link and explain what should be reviewed, including operator changes, closures, or a requested removal. Requests are moderated and never change or remove a profile automatically.